Foragaz has, since 1988, developed a vast and varied expertise in the oil and gas field. Among these operations, we can find:
- Oil and gas drilling to a total depth of 2,000 m
- Workover up to 2,700 m
- Casing exit
- Side track leg
- Permanent installation of bottom hole gage
- Installation of pumping equipment up to 2,300 m (Jack Pump)
- Slickline unit up to 2,300 m
- Gradient Survey
- Installation of bottom hole
- gage for production testing
- Memory Production Logging Tools
- Installation of Plunger lift
- Installation of screw pump (1,200 m)
- Testing for interference/production/pumping
- Fluid level tracking
- 2 echometers (1,500 et 5,000 psi)